Our company are going to build three main plants, more than the deep processing plants and auxiliary utilities. The project is one of the outside attract investments projects of Guizhou City, Liaoning Province . The following plants are going to be built: Heavy oil desulfurizing and dehydration plant (8MT/Y), Heavy traffic-road asphaltum plant ( 2MT/Y), Heavy oil delay coking plant (1.6MT/Y) , auxiliary plants , utilities and oil storehouse (5 million stere). The project has been approved by Province and City Development and Reform Committee ( LDRC for short). Government pagers issued by Liaoning Development and Reform Committee : LDRC No.2005-947: Ratification of proposals for the Heavy traffic-road asphaltum project and its auxiliary plants of Liaoning Jiaxing Hongtai Petrochemical Ltd. Company. LDRC No.2005-966 : Ratification of proposals for the 1.6MT/Y Delay coking project . LDRC No.2005-967: Ratification of proposals for 2MT/Y Heavy oil catalytic cracking project and its auxiliary plants. Our project has been placed as one of Liaoning 100 Important Investment Projects in 2006. It has been placed in Yingkou City “ The Eleventh Five-year “ Development Plans . The above mentioned projects total investment is 12.42107 billion RMB. The project floor area is 3.4 sq.km .The construction period is three years. Our company has finished correlative land requisition procedures (Gaizhou City Planning and Construction Committee’s paper No.2005-08 [Project Site Selection Position Book ] , No.2006-05 [Planning License of Construction Land] ) Now our company is doing the works of working drawing design, leveling land , geological prospecting , environment evaluating , fire safety evaluation and safety evaluation.
    There are the following nineteen plants in the factory site :
                            1. Material pretreatment plant (8MT/Y)
                            2. Delay coking plant (1.6 MT/Y)
                            3. Heavy traffic-road asphaltum plant (2MT/Y)
                            4. Heavy oil catalytic cracking plant (2MT/Y)
                            5. Catalytic diesel oil hydrogenation upgrading plant (0.65MT/Y)
                            6. Coking gasoline and diesel oil hydrogenation refining plant (0.65MT/Y)
                            7. Hydrogenation cracking plant (1.5MT/Y)
                            8. Catalytic reforming plant (0.7MT/Y)
                            9. Gas desulfurizing plant (0.55MT/Y)
                            10. Gas separation plant (0.3MT/Y)
                            11. Sulfur plant (0.04MT/Y)
                            12. Ethyl benzene plant (0.06MT/Y)
                            13. Polypropylene plant (0.1MT/Y)
                            14. Hydrogen production plant 3.0×104Nm/h
                            15. MTBE Plant ( 0.04 MT/Y)
                            16. Sewage steam distillation plant 120T/H
                            17. Oil storage plant (5 million stere)
                            18.(Gas)CFB boiler (130 T/H)
                            19. Utilities ( including water , electricity and steam)
                            20. Chandlery dock (0.05 MT/Y)

 
 
 
 